MusaDesign studio is taking shape
MusaDesign studio is taking shape. Internal space is now partitioned and walls are painted. The two major parts of the project that still need to be completed are PaneLite installation and metal staircase construction.
PanelLite honeycomb panels have already shipped and metal supports for them are going to be built next week.
We've spent this weekend working on an architectural installation that will be suspended in the front window of our studio. It took two days of cutting and gluing, but, our sculpture ended up looking clean beautiful.
MusaDesign studio, work in progress:

Art work for the MusaDesign studio. It took two days to build this sculpture this weekend. It will be painted next week and will be suspended behind the front window of our studio.

PanelLite honeycomb panels will be used to build complex shaped wall separating office on the left from the rest of the space. Right in front of the office on the left, you can see (if you pay attention) a big hole that leads to the downstairs space. Metal staircase and a small "bridge" leading to the office over the downstairs opening is going to be built next week as well:

interior design seattle
musadesign
PanelLite honeycomb panels have already shipped and metal supports for them are going to be built next week.
We've spent this weekend working on an architectural installation that will be suspended in the front window of our studio. It took two days of cutting and gluing, but, our sculpture ended up looking clean beautiful.
MusaDesign studio, work in progress:

Art work for the MusaDesign studio. It took two days to build this sculpture this weekend. It will be painted next week and will be suspended behind the front window of our studio.

PanelLite honeycomb panels will be used to build complex shaped wall separating office on the left from the rest of the space. Right in front of the office on the left, you can see (if you pay attention) a big hole that leads to the downstairs space. Metal staircase and a small "bridge" leading to the office over the downstairs opening is going to be built next week as well:

